California Title 24 Energy Reports — Standard & Rush Options Available — Call (310) 853-3010 or Order Online Now →
About Us

California's Statewide Title 24 Partner

We prepare fast, accurate Title 24 Energy Compliance Reports for building permits across every California county — from solo homeowners to busy general contractors.

What We Do

Apex Compliance Solutions prepares Title 24 Energy Compliance Reports — the documentation California requires for most building permits involving conditioned space. We work with homeowners, contractors, and architects across the state, covering every project type from ADUs and garage conversions to full commercial buildouts.

Our reports are generated using current state-approved compliance software (CBECC-Res and CBECC-Com), tailored to your project's exact climate zone, and formatted to match the submittal requirements of your local building department — whether that means an online permit portal or an in-person plan check appointment.

Why Work With Us

All 58 California counties served
3–5 business day standard turnaround
Same-day rush may be available for eligible projects
Every California climate zone covered
Clear HERS verification disclosure
Affordable revisions when plans change

Our Process

Submit your plans, and we review the project to identify the correct compliance path — prescriptive or performance — before running the full energy calculation. Your completed report is delivered as a permit-submittal-ready PDF, typically within 3–5 business days after complete project information and plans are received.

How Apex Prepares a Title 24 Report

  1. Project plans and scope are reviewed.
  2. The correct climate zone and code requirements are identified.
  3. Envelope, window, HVAC, water-heating and other relevant project information is modeled using applicable current state-approved compliance software (CBECC-Res for residential projects).
  4. The applicable prescriptive or performance path is evaluated.
  5. Required HERS measures are disclosed when applicable.
  6. The completed energy compliance package is prepared for permit submittal.
  7. Apex may coordinate with an independent certified HERS rater when field verification is required, but Apex does not perform HERS field verification.

Who documents what: Apex prepares the CF1R design and compliance documentation. Installers or contractors complete CF2R installation certificates for applicable measures, and an independent certified HERS rater completes CF3R verification when it is required. Learn how CF1R, CF2R and CF3R differ.

Experience in Practice

To see how the process plays out on an actual project, read our anonymized Los Angeles garage-conversion case study, or browse the case-study hub. Client, address and contractor details are never published.

Ready to Order Your Report?

Fast, accurate, permit-ready. Standard turnaround is 3–5 business days after complete project information and plans are received. Rush service may be available depending on project scope.

Call Now — (310) 853-3010